Plumbing

Report app for plumbing, heating and ventilation

The pressure test belongs in the report, not on the back of a delivery note: pressure, duration, tight or not — plus pipe metres, taps and valves and a photo of the pressure gauge.

In the report

Pipe, valves, pressure test

The «Plumbing / Heating / Ventilation» profile adds five fields to the report. Three of them belong to the pressure test.

Pipe laidm

The metres of pipe laid that day.

Taps / valvesNumber

Taps and valves fitted, as a number.

Test pressurebar

The pressure applied in the test.

Test durationh

How long the test ran.

Leak-tight (no leaks)Yes/No

The result of the test as a tick.

New build and service

One business, two ways of reporting

Many plumbing businesses install in new builds and also do service work. Baurapport handles both in the same account.

  • Pressure test with photo

    Pressure, duration and «leak-tight» are in the daily output, the photo of the pressure gauge in the same report.

  • Fields per site

    If you also run «Service / Maintenance», you decide per site or department which fields a new report starts with — pipe metres in new builds, system no. in service.

  • Schematics and plans at hand

    You store riser diagrams and plans on the site, as PDF, image or DWG. On the phone they are at hand on site.

  • Copper pipe at a glance

    15 and 22 mm copper pipe is in stock with a minimum of 30 m each. If stock falls below that, the stock list marks the item, and the Cockpit counts it among the items below minimum.

baurapport.ch/baustellen
Sites in the office with status, progress, reports and hours

Sealing, soldering, testing

13 items for plumbing: hemp, silicone, solder and soldering paste, copper pipe in two sizes and a PVC reducer, plus pipe wrench, Swedish-pattern wrench, torch set, a pressure gauge up to 10 bar, heat-resistant gloves and safety glasses.

  • Hemp 100g
  • Sanitary silicone white
  • Soft solder 500g
  • Copper pipe 15mm
  • Copper pipe 22mm
  • Pipe wrench 24"
  • Propane torch set
  • Pressure gauge 0-10 bar

Checklist per site

What needs doing on site is listed as a checklist on the site — your workers tick it off in the report. For example:

  • Pipes photographed before being walled in
  • Pressure test done, gauge photographed
  • Taps and valves fitted and checked for function
  • Customer shown how to operate the system

Examples — you set the items yourself.

Frequently asked questions

What businesses want to know first

Can I record the pressure test in the report?

Yes: the test pressure in bar, the test duration in hours and whether the pipework is leak-tight. There is no separate form for a test report; you store the photo of the pressure gauge in the same report.

We do new builds and service — can we do both?

Yes. Under Company, tick Service / Maintenance as an additional trade. You then choose per site or department which fields a new report starts with. Existing reports keep their fields.

Does the profile also apply to heating and ventilation?

Yes, in the app it is called «Plumbing / Heating / Ventilation». If you mainly maintain systems, add the «Service / Maintenance» profile with system no., readings and defects.

Do the installed materials go on the invoice?

If they were chosen from stock, yes: the time-and-materials invoice takes them over at the sales price you store on the item. Materials typed in freely appear without a price until you enter one.

Ready to go digital?

Try it free for 14 days — with your own team and your own sites. Then you decide.

14 days free Cancel anytime