Material report template: record everything

Free material report template as PDF and Excel. Plus: what it contains, how not to forget anything and how report, invoice and stock connect.

Nov 21, 2026 · 2 min. read

Download the «Material report» template

Free, no sign-up. With space for your logo.

Instead of paper: How it works in the app: Stock and tools

What is a material report for?

The material report records which material was used on a site. For time-and-materials work it goes on the invoice, and afterwards it is missing from stock. Material that is not noted anywhere, you have given away.

What goes in it?

  • Site, date and who installed the material
  • Quantity and unit, for example 25 m, 12 pieces, 3 kg
  • Description and, if available, item number
  • Delivery note, if the material was delivered directly to the site
  • Returns: what goes back to stock unused

How not to forget material

  1. Record it the same day. After a week nobody knows how many metres of pipe it was.
  2. Consistent units. A metre stays a metre and a piece stays a piece, otherwise nothing adds up.
  3. Collect the delivery notes and note them on the report.
  4. Don’t forget small parts. Screws, wall plugs, silicone: agree with the customer how they are invoiced, and stick to it.

Report, invoice and stock

The material report is the bridge between site and office: what is written on it goes on the invoice, and what was used gets reordered. If the report only reaches the office weeks later, both are missing.

Recording material digitally

In Baurapport.ch the employee records the material directly in the report, together with the hours. In the office it is ready as soon as the report is submitted, and you create the time-and-materials invoice from the reports. You manage stock and tools in the same app.

Try 14 days free

Frequently asked questions

Doesn’t the material simply go into the site report?

Often, yes: the site report template has a section for material. A separate material report is worth it when there is a lot of material or several people install on the same site.

How precisely do small parts need to be recorded?

As precisely as agreed with the customer. If they are invoiced as a lump sum, one line is enough; otherwise each item separately.

Does the Excel template calculate anything?

The Excel template has a column for the unit price and calculates the amount per row and the total by itself.